×

              News

              Waste Incineration Power Generation Project in Bole, Xinjiang Province was signed
              Date:2016-07-12 From:海螺創(chuàng )業(yè)

              On 4?April?2016, “The Investment?Agreement about Municipal Waste Incineration Power Generation Project in Bole” was officially signed between the government in Bole and Conch Venture.?

              ?

              ?

              Mr Ji Qinying, the CEO of Conch Venture signed the agreement.

              ?

              ?

              The capacity of this project was designed to be 500t/d on first stage. The project is meaningful to the local environment.

              Before the signing, Mr Ji went to check the potential plant site with the company of leaders from government of Bole.

              99精品视频免费观看|国产亚洲综合久久系列|精品国产av 无码一区二区三区|一级做a爰片性色毛片免费网站|无码免费一区二区三区|亚洲日韩妇女av一区二区|久久无码精品一区