×

              News

              Conch Venture Obtained Waste Incineration Power Generation Project in Susong
              Date:2016-07-12 From:海螺創(chuàng )業(yè)

              On 3?March?2016, “The Investment Agreement about Municipal Waste Incineration Power Generation Project in Susong” was officially signed between the government in ?Susong and Conch Venture.?The capacity of this project, which in furture will reach 800t/d, was designed to be 400t/d on first stage.

              ?

              ?

              The delegation from Susong and leaders from Conch Venture attended the signing ceremony.

              ?

              ?

              ?

              The project in Susong is the first waste incineration power generation?project in the monkey year. Conch Venture will do all the preparation work and the project will come into construction as soon as possible.

              99精品视频免费观看|国产亚洲综合久久系列|精品国产av 无码一区二区三区|一级做a爰片性色毛片免费网站|无码免费一区二区三区|亚洲日韩妇女av一区二区|久久无码精品一区