×

              News

              Waste Incineration Power Generation Project in Tongren was signed
              Date:2016-07-12 From:海螺創(chuàng )業(yè)

              On 30?May?2016, “The Cooperation Agreement about Municipal Waste Incineration Power Generation and Joint Disposal Project in Tongren” was officially signed between the government in Tongren and Conch Venture.?The capacity of this project was designed to be 600t/d. The project is meaningful to the local environment.

              99精品视频免费观看|国产亚洲综合久久系列|精品国产av 无码一区二区三区|一级做a爰片性色毛片免费网站|无码免费一区二区三区|亚洲日韩妇女av一区二区|久久无码精品一区